China, November 2002
28th December 2005

Subsequent to a message being left on this site asking "where is the Chinese steam?", I've made a start on adding it to the gallery! I was able to participate in the tour organized by "Steam in Paradise" for readers of "The Railway Magazine" in November 2002, and a very memorable and brilliant tour it was!
Photos taken using Pentax Z-70 and MZ-6 SLR cameras with a variety of Pentax lenses on Kodachrome 200 slide film

<-- Index | Showing 1-34 of 34 pictures | Index -->
2002/11/04, 01. SY Class 2-8-2 No. SY1753 crosses the river bridge en route to the steel works at Chengde with a loaded coal train, 08:48, Monday 4th November 2002.
2002/11/04, 01. SY Class 2-8-2 No. SY1753 crosses the river bridge en route to the steel works at Chengde with a loaded coal train, 08:48, Monday 4th November 2002.
1024x654
GMP_Slide30356_SY1753_Cheng.jpg
2002/11/04, 02. 2-8-2 No. SY1726 crosses the river bridge near the steelworks on the branch from Chengde with another loaded coal train, its exhaust steam condensing nicely in the cold air. 10:10, Monday 4th November 2002.
2002/11/04, 02. 2-8-2 No. SY1726 crosses the river bridge near the steelworks on the branch from Chengde with another loaded coal train, its exhaust steam condensing nicely in the cold air. 10:10, Monday 4th November 2002.
1024x627
GMP_Slide30382_SY1726_ChengdeBridge.jpg
2002/11/04, 03. 2-8-2 No. SY1726 crosses the river bridge near the steelworks on the branch from Chengde with another loaded coal train, its exhaust steam condensing nicely in the cold air. 10:10, Monday 4th November 2002.
2002/11/04, 03. 2-8-2 No. SY1726 crosses the river bridge near the steelworks on the branch from Chengde with another loaded coal train, its exhaust steam condensing nicely in the cold air. 10:10, Monday 4th November 2002.
1024x684
GMP_Slide30385_SY1726_ChengdeBridge.jpg
2002/11/04, 04. Nicely cleaned-up SY 2-8-2 SY0099 returns light engine from the steelworks into the sidings at Shuangtashan prior to doing some shunting in the yard. The foreground branch line leads to another industrial area. 10:40, Monday 4th November 2002.
2002/11/04, 04. Nicely cleaned-up SY 2-8-2 SY0099 returns light engine from the steelworks into the sidings at Shuangtashan prior to doing some shunting in the yard. The foreground branch line leads to another industrial area. 10:40, Monday 4th November 2002.
1024x678
GMP_Slide30389_SY0099_Shuangtashan.jpg
2002/11/04, 05. SY1753 is just bringing a load of coal from the local colliery into the yard at Shuangtashan and passes SY1522 which has been doing some shunting in the yard. 11:27, Monday 4th November 2002.
2002/11/04, 05. SY1753 is just bringing a load of coal from the local colliery into the yard at Shuangtashan and passes SY1522 which has been doing some shunting in the yard. 11:27, Monday 4th November 2002.
1024x684
GMP_Slide30407_SY1522_Shuangtashan.jpg
2002/11/04, 06. Supershine SY Class 2-8-2 No. SY1522 stands in the yard at Shuangtashan on the Chengde steelworks line as a fellow SY No. 1753 passes it with a train off the local colliery branch line. Monday 4th November 2002.
2002/11/04, 06. Supershine SY Class 2-8-2 No. SY1522 stands in the yard at Shuangtashan on the Chengde steelworks line as a fellow SY No. 1753 passes it with a train off the local colliery branch line. Monday 4th November 2002.
1024x690
GMP_Slide30410_SY1522_Chengde.jpg
2002/11/04, 07. 2-8-2 No. SY1422 shunts cauldron wagons of molten metal at the Chengde Steelworks, Monday 4th November 2002.
2002/11/04, 07. 2-8-2 No. SY1422 shunts cauldron wagons of molten metal at the Chengde Steelworks, Monday 4th November 2002.
1024x685
GMP_Slide30434_SY1422_Chengde.jpg
2002/11/04, 08. 2-8-2 SY1753 working tenderfirst light engine comes off a short industrial branch off the line to Chengde steelworks near Shuangtashan, Monday 4th November 2002. The strange formation in the background is presumably an ancient volcanic plug, with a Pagoda built on top!
2002/11/04, 08. 2-8-2 SY1753 working tenderfirst light engine comes off a short industrial branch off the line to Chengde steelworks near Shuangtashan, Monday 4th November 2002. The strange formation in the background is presumably an ancient volcanic plug, with a Pagoda built on top!
1024x591
GMP_Slide30446_SY1753_Cheng.jpg
2002/11/04, 09. JS Class 2-8-2 No. JS6403 comes off the depot at Shuangtashan on the Chengde steelworks branch and opens its blow-down valves to clear sediment from its boiler water spaces, 14:20, Monday 4th November 2002.
2002/11/04, 09. JS Class 2-8-2 No. JS6403 comes off the depot at Shuangtashan on the Chengde steelworks branch and opens its blow-down valves to clear sediment from its boiler water spaces, 14:20, Monday 4th November 2002.
1024x678
GMP_Slide30454_JS6403_Cheng.jpg
2002/11/04, 10. Lovingly polished-up JS Class 2-8-2 No. JS6403 comes off the depot at Shuangtashan on the Chengde steelworks branch to take up its next duty, catching a glint from the sun, 14:25, Monday 4th November 2002.
2002/11/04, 10. Lovingly polished-up JS Class 2-8-2 No. JS6403 comes off the depot at Shuangtashan on the Chengde steelworks branch to take up its next duty, catching a glint from the sun, 14:25, Monday 4th November 2002.
1024x648
GMP_Slide30460_JS6403_Chengde.jpg
2002/11/04, 11. 2-8-2 SY0872 blackens the sky as it crosses the river bridge with another train of coal for the Chengde Steelworks. 15:59, Monday 4th November 2002.
2002/11/04, 11. 2-8-2 SY0872 blackens the sky as it crosses the river bridge with another train of coal for the Chengde Steelworks. 15:59, Monday 4th November 2002.
1024x684
GMP_Slide30480_SY0872_Cheng.jpg
2002/11/04, 12. 2-8-2 SY0872 crossing the river bridge with another train of coal for the Chengde Steelworks - the engines had to work quite hard with these heavy trains! 16:00, Monday 4th November 2002.
2002/11/04, 12. 2-8-2 SY0872 crossing the river bridge with another train of coal for the Chengde Steelworks - the engines had to work quite hard with these heavy trains! 16:00, Monday 4th November 2002.
1024x686
GMP_Slide30483_SY0872_Cheng.jpg
2002/11/04, 13. 2-8-2 SY0872 has crossed the river bridge with another train of coal for the Chengde Steelworks - the engines had to work quite hard with these heavy trains! 16:00, Monday 4th November 2002.
2002/11/04, 13. 2-8-2 SY0872 has crossed the river bridge with another train of coal for the Chengde Steelworks - the engines had to work quite hard with these heavy trains! 16:00, Monday 4th November 2002.
1024x686
GMP_Slide30486_SY0872_Chengde.jpg
2002/11/05, 1. SY Class 2-8-2 No. SY0835 is nicely bulled-up in the industrial environment of the huge steelworks at Anshan, dwarfed by the blast furnaces towering over it, Tuesday 5th November 2002.
2002/11/05, 1. SY Class 2-8-2 No. SY0835 is nicely bulled-up in the industrial environment of the huge steelworks at Anshan, dwarfed by the blast furnaces towering over it, Tuesday 5th November 2002.
1024x687
GMP_Slide30574_SY0835_Ansha.jpg
2002/11/05, 2. Some wag asked if this was a Brush Type 4! SY Class 2-8-2 No. SY0902 has just been through works for an overhaul and is now in steam at the depot in Anshan Steelworks, while a member of staff makes sure everything is tidy. Tuesday 5th November 2002.
2002/11/05, 2. Some wag asked if this was a Brush Type 4! SY Class 2-8-2 No. SY0902 has just been through works for an overhaul and is now in steam at the depot in Anshan Steelworks, while a member of staff makes sure everything is tidy. Tuesday 5th November 2002.
1024x655
GMP_Slide30601_SY0902_Anshan.jpg
2002/11/05, 3. With one of the many blast furnaces towering in the distance, a loco servicing crew enjoy a joke as they go about their duties with 2-8-2 SY1568 at Anshan steelworks, Tuesday 5th November 2002. The railway system here used steam, diesel and electric traction (one of the diesels can be seen in the background). The steel works is vast, covering 37 square kilometres and employing around 200,000 people!
2002/11/05, 3. With one of the many blast furnaces towering in the distance, a loco servicing crew enjoy a joke as they go about their duties with 2-8-2 SY1568 at Anshan steelworks, Tuesday 5th November 2002. The railway system here used steam, diesel and electric traction (one of the diesels can be seen in the background). The steel works is vast, covering 37 square kilometres and employing around 200,000 people!
1024x687
GMP_Slide30619_SY1568_Ansha.jpg
2002/11/05, 4. The driver of 2-8-2 SY1566 watches as a fellow engineman polishes up the numberplate of SY0836 as they await their next turns of duty at the steam engine depot within Anshan Steelworks. Tuesday 5th November 2002.
2002/11/05, 4. The driver of 2-8-2 SY1566 watches as a fellow engineman polishes up the numberplate of SY0836 as they await their next turns of duty at the steam engine depot within Anshan Steelworks. Tuesday 5th November 2002.
1024x683
GMP_Slide30677_SY1566_Anshan.jpg
2002/11/06, 1. Sunrise at Daqing loco depot on the Tiefa coal-mining system. On the left SY1771 glints in the early sunshine as a fellow SY 2-8-2 goes off depot in the distance. The level-crossing had been closed for this move - it has now reopened to allow coal-miners on their bikes to head for the nearby pithead, 06:45, Wednesday 6th November 2002.
2002/11/06, 1. Sunrise at Daqing loco depot on the Tiefa coal-mining system. On the left SY1771 glints in the early sunshine as a fellow SY 2-8-2 goes off depot in the distance. The level-crossing had been closed for this move - it has now reopened to allow coal-miners on their bikes to head for the nearby pithead, 06:45, Wednesday 6th November 2002.
1024x668
GMP_Slide30747_SY1771_Daqin.jpg
2002/11/06, 2. Sunrise at Daqing loco depot on the Tiefa coal-mining system. On the right SY1771 glints in the early sunshine as a fellow SY 2-8-2 goes off depot in the distance. The level-crossing has been closed for this move - it is about to be reopened to allow coal-miners on their bikes to head for the nearby pithead, 06:45, Wednesday 6th November 2002.
2002/11/06, 2. Sunrise at Daqing loco depot on the Tiefa coal-mining system. On the right SY1771 glints in the early sunshine as a fellow SY 2-8-2 goes off depot in the distance. The level-crossing has been closed for this move - it is about to be reopened to allow coal-miners on their bikes to head for the nearby pithead, 06:45, Wednesday 6th November 2002.
1024x684
GMP_Slide30749_SY1771_Daqing.jpg
2002/11/06, 3. While a member of the local population goes about his business aboard a horse-drawn cart, SY 2-8-2 SY0435 shunts in the yard at Dalong Colliery, alongside the triangular junction at Sanjiazi on the Tiefa system, Wednesday 6th November 2002.
2002/11/06, 3. While a member of the local population goes about his business aboard a horse-drawn cart, SY 2-8-2 SY0435 shunts in the yard at Dalong Colliery, alongside the triangular junction at Sanjiazi on the Tiefa system, Wednesday 6th November 2002.
1024x654
GMP_Slide30783_Cart_SY0435_Dalong.jpg
2002/11/07, 1. Sunrise over Daqing depot on the Tiefa coal-mining system finds JS class 2-8-2 JS5029 simmering in the early light while SY0860 is being prepared for duty. The steam crane used for coaling the engines also awaits its next customer. Thursday 7th November 2002.
2002/11/07, 1. Sunrise over Daqing depot on the Tiefa coal-mining system finds JS class 2-8-2 JS5029 simmering in the early light while SY0860 is being prepared for duty. The steam crane used for coaling the engines also awaits its next customer. Thursday 7th November 2002.
1024x685
GMP_Slide30920_JS5029_Daqing.jpg
2002/11/07, 2. Sunrise at Daqing loco depot, Tiefa coal-mining system, 06:40, Thursday 7th November 2002. SY0860 is in the foreground, SY1769 in the background, both being prepared for work.
2002/11/07, 2. Sunrise at Daqing loco depot, Tiefa coal-mining system, 06:40, Thursday 7th November 2002. SY0860 is in the foreground, SY1769 in the background, both being prepared for work.
1024x693
GMP_Slide30932_SY0860_Daqin.jpg
2002/11/07, 3. Dusk at Daqing loco depot on the Tiefa coal-mining system, and there is now a light covering of snow on the ground as SY1769 is prepared for its next duty. In the background, the steam crane used to coal the engines trundles along its siding. 16:45, Thursday 7th November 2002.
2002/11/07, 3. Dusk at Daqing loco depot on the Tiefa coal-mining system, and there is now a light covering of snow on the ground as SY1769 is prepared for its next duty. In the background, the steam crane used to coal the engines trundles along its siding. 16:45, Thursday 7th November 2002.
1024x689
GMP_Slide31094_SY1769_Daqin.jpg
2002/11/07, 4. At Diaobingshan station in Tiefa, the snow has been blowing around in flurries as SY1751 runs round its passenger train to form the 17:31 departure, Train 303, for the east line. Thursday 7th November 2002.
2002/11/07, 4. At Diaobingshan station in Tiefa, the snow has been blowing around in flurries as SY1751 runs round its passenger train to form the 17:31 departure, Train 303, for the east line. Thursday 7th November 2002.
1024x679
GMP_Slide31098_SY1751_Diaob.jpg
2002/11/09. JiTong Railway 2-10-2 QJ6631 sets off from Lindong with a westbound freight train to Daban, the famous Pagoda in the foreground, 10:20, Saturday 9th November 2002.
2002/11/09. JiTong Railway 2-10-2 QJ6631 sets off from Lindong with a westbound freight train to Daban, the famous Pagoda in the foreground, 10:20, Saturday 9th November 2002.
1024x693
GMP_Slide31236_QJ6631_Lindo.jpg
2002/11/11, 1. Driver's eye view from a QJ 2-10-2 as it blasts its way across Simingyi
2002/11/11, 1. Driver's eye view from a QJ 2-10-2 as it blasts its way across Simingyi "Horseshoe" Viaduct on the eastbound climb of the Jing Peng Pass, double-heading with another QJ with a freight from Haloukou to Daban, Monday 11th November 2002.
1024x672
GMP_Slide31558_QJ6274_Simin.jpg
2002/11/11, 2. The sun fights its way through the clouds and smoke to light up the boiler of 2-10-2 No. QJ6274, the lead engine of a pair at the head of an eastbound freight on the climb of the Jing Peng pass. Monday 11th November 2002.
2002/11/11, 2. The sun fights its way through the clouds and smoke to light up the boiler of 2-10-2 No. QJ6274, the lead engine of a pair at the head of an eastbound freight on the climb of the Jing Peng pass. Monday 11th November 2002.
1024x687
GMP_Slide31567_QJ6274_JingPeng_Footplate.jpg
2002/11/11, 3. The afternoon sunshine creates lengthening shadows as a flock of sheep and goats are herded westwards across the frozen fields - in the background double-headed QJ class 2-10-2s Nos. 6638 & 6630 flog their way up the Jing Peng  pass near Hadashan with an eastbound freight train, 16:15, Monday 11th November 2002.
2002/11/11, 3. The afternoon sunshine creates lengthening shadows as a flock of sheep and goats are herded westwards across the frozen fields - in the background double-headed QJ class 2-10-2s Nos. 6638 & 6630 flog their way up the Jing Peng pass near Hadashan with an eastbound freight train, 16:15, Monday 11th November 2002.
1024x606
GMP_Slide31701_EastboundQJs_JingPeng.jpg
2002/11/12, 1. JiTong Railway 2-10-2s Nos. QJ6735 & QJ6763 slog their way up the line from Jing Peng to the summit at Shangdian with an eastbound freight train of around 2000 tonnes at 08:15 on the morning of Tuesday 12th November 2002, the temperature still well below freezing!
2002/11/12, 1. JiTong Railway 2-10-2s Nos. QJ6735 & QJ6763 slog their way up the line from Jing Peng to the summit at Shangdian with an eastbound freight train of around 2000 tonnes at 08:15 on the morning of Tuesday 12th November 2002, the temperature still well below freezing!
1024x619
GMP_Slide31752_Eastbound_QJ.jpg
2002/11/12, 2. A while later and the same train (QJs 6735 & 6763) rounds one of the loops and crosses the Brickworks viaduct in
2002/11/12, 2. A while later and the same train (QJs 6735 & 6763) rounds one of the loops and crosses the Brickworks viaduct in "Happy Valley" before plunging into Tunnel No. 2 on the eastbound climb to Shangdian from Jing Peng, 09:10, Tuesday 12th November 2002.
1024x566
GMP_Slide31774_Eastbound_QJ.jpg
2002/11/13, 1. Double-headed QJ Class 2-10-2s Nos. QJ6876 & QJ6905 in charge of train 22844, the 04:00 freight from Daban to Haloukou cross the Galadesitai viaduct at Reshui at sunrise, 07:30 on Wednesday 13th November 2002 on the westbound climb of the Jing Peng Pass.
2002/11/13, 1. Double-headed QJ Class 2-10-2s Nos. QJ6876 & QJ6905 in charge of train 22844, the 04:00 freight from Daban to Haloukou cross the Galadesitai viaduct at Reshui at sunrise, 07:30 on Wednesday 13th November 2002 on the westbound climb of the Jing Peng Pass.
1024x545
GMP_Slide31904_WestboundQJs.jpg
2002/11/13, 2. QJs Nos. 6998 & 6630 are on the eastbound climb of the Jing Peng Pass at Simingyi
2002/11/13, 2. QJs Nos. 6998 & 6630 are on the eastbound climb of the Jing Peng Pass at Simingyi "Horseshoe" Viaduct with train 22829, 09:10 from Haloukou to Daban, Wednesday 13th November 2002.
1024x686
GMP_Slide31989_EastboundQJs.jpg
2002/11/13, 3. QJ Class 2-10-2s Nos. 7012 & 6878 battle their way the last few yards to the summit of the Jing Peng pass as they approach Shangdian's outer home signals, still going
2002/11/13, 3. QJ Class 2-10-2s Nos. 7012 & 6878 battle their way the last few yards to the summit of the Jing Peng pass as they approach Shangdian's outer home signals, still going "all-out" as the light fails and the next lot of snow comes in! The train is eastbound 22833, the 11:35 freight from Haloukou to Daban, 16:20, Wednesday 13th November 2002.
1024x683
GMP_Slide32049_EastboundQJs.jpg
2002/11/15. JF1 Class 2-8-2 No. JF1 304 with the Mao Tse Tung (Maozedong) decorated headboard in the Beijing Railway Museum, Friday 15th November 2002.
2002/11/15. JF1 Class 2-8-2 No. JF1 304 with the Mao Tse Tung (Maozedong) decorated headboard in the Beijing Railway Museum, Friday 15th November 2002.
1024x685
GMP_Slide32198_JF1-304_Beij.jpg
Geoff Plumb's Railway Photos